0Exif MM * b ( ; The Zero Trim innovation is a method of reducing the piling to prevent any breaking that we would traditionally use in breakdown of the pile before putting the capping beam or pile cap on.
It allows us to vacuum excavator to remove wet concrete out to a finish level rather than letting the concrete cure, rather than the traditional method of putting people down in the excavation to manually breakout the concrete. H H HS2 Ltd © HS2 Ltd *Photoshop 3.0 8BIM Image
innovation pilling area east scs Area East, SCSP
Holly CliftonU The Zero Trim innovationn HS2 Ltd L TSpecial Instructions: these were uploaded for media story
Consent Type: Event notice 8BIM% foJXhttp://ns.adobe.com/xap/1.0/
Image
innovation
pilling
area east
scs
} !1AQa"q2#BR$3br
%&'()*456789:CDEFGHIJSTUVWXYZcdefghijstuvwxyz w !1AQaq"2B #3Rbr
$4%&'()*56789:CDEFGHIJSTUVWXYZcdefghijstuvwxyz ! ? zE|9ܲ.vҲ.ezySQZǟʛ5(ΒSn0~?उ+flu,CGڔIrJwvWsvcssPn
ϔlt*PnuGO
Ri-*-"aO^{IHYFp1b,?